Oct 2024 London Borough of Ealing The London Borough of Ealing is considered leaders in deploying Electric Vehicle (EV) infrastructure. Partnering with Believ, we have installed over 300 charge point sockets and expect to install over 100 more. Read more
Apr 2024 London Borough of Waltham Forest Study The London Borough of Waltham Forest is an outer London Borough. It is home to over 257,000 residents and over 11,000 registered businesses. Read more
Mar 2024 Gosport Borough Council Study Gosport Borough Council is the local authority in the borough of Gosport, in the county of Hampshire, England. It is home to over 80,000 residents and popular with tourists due to its location on the south coast of England, having two marinas and close links with the Isle of Wight. Read more
Mar 2024 London Borough of Redbridge, in partnership with Uber Study More than 170 fast chargers for electric vehicles are being installed in Redbridge by Believ to boost the borough’s EV network and support greener travel thanks to a landmark project with Uber. Read more
Jul 2022 Croydon Case Study Believ helps local authorities deploy an electric vehicle infrastructure for their residents simply, cost-effectively and affordably. Read more
Jul 2022 Hammersmith and Fulham Case Study Believ helps local authorities deploy an electric vehicle infrastructure for their residents simply, cost-effectively and affordably. Read more
Apr 2022 North Northants Council leads the charge on-street EV infrastructure Believ helps local authorities deploy an electric vehicle infrastructure for their residents simply, cost-effectively and affordably. Read more